Nshipyard Canada · Project 10

What got built near the stations.

Twenty-nine published studies measured what new rail stations do to nearby housing prices. Almost nobody measured what got built next to them. This project joins 125 Toronto rail stations to 2,314 development projects: every station gets an 800-metre zone, and every zone gets its housing supply, before and after opening.

125

rail stations inventoried: 78 open (TTC subway, GO Transit) and 47 under construction

41.1%

of all pipeline homes (365,770 of 890,247) sit within 800 metres of an open station

0 to 4

projects near Finch West station before vs after its December 2017 opening: 0 units became 3,593

441,649

pipeline homes already clustered near stations that have not opened yet: the anticipation is measurable

Stations

Pick a station. See its supply.

Showing 0 of 0

Search above or browse the list. Each station shows every development project within 800 metres, split by status and by whether the application arrived before or after the station opened.

Showcase

Supply follows the tracks, unevenly.

Two in five pipeline homes sit within 800 metres of an open station, but the response is lumpy: downtown stations absorbed tens of thousands of homes each while suburban stations opened to silence. And the future is already priced in: 441,649 pipeline homes cluster around stations that have not opened yet.

Top 12 stations by pipeline homes within 800 m

Development pipeline units, 800-metre zones. Downtown dominates; the Eglinton Crosstown corridor is next.

Before vs after opening: the 2017 subway extension

Six stations opened December 17, 2017 on the Toronto-York Spadina extension. Finch West went from zero nearby projects to 4 (3,593 homes); York University from zero to 5 (1,009 homes). Supply responded where the extension landed, years before trains ran the full corridor.

Finch West

Before opening

0 homes

After opening

3,593 homes

York University

Before opening

0 homes

After opening

1,009 homes

Downsview Park

Before opening

205 homes

After opening

350 homes

The anticipation zone

Stations under construction already anchor 441,649 pipeline homes. Front-Spadina (Ontario Line) leads with 36,313; Corktown follows with 34,038. The literature finds price gains arrive at announcement; this dataset shows the supply pipeline does too.

Pipeline homes within 800 m of unopened stations, top 8.

Where the pipeline sits

Of the 365,770 pipeline homes within 800 metres of an open station, the split between built, active, and proposed shows how much of the transit-adjacent supply is real versus planned.

What the literature says about prices

Twenty-nine published studies find new rail stations add roughly 2-10% to nearby home values, with most of the gain arriving at announcement rather than opening. This project measures the other half of the story: whether housing supply responded. Price data at this geography is not open in Canada; the supply side is.

Methodology

How the station file was built, and where it is weak.

  1. 01

    Station inventory: 73 TTC subway stations located exactly from the TTC GTFS feed (Toronto Open Data, retrieved 2026-10-08), plus GO Transit stations and 47 under-construction stations (Eglinton Crosstown, Ontario Line, Scarborough extension) located from the City's Major Transit Station Areas shapefile, converted from MTM Zone 10 (NAD27) and calibrated against 58 GTFS stations with a median residual of 27 metres.

  2. 02

    Opening dates for TTC stations are exact, compiled from TTC public records (1954-03-30 for the original Yonge segment through 2017-12-17 for the Toronto-York Spadina extension). GO station dates are approximate years from GO Transit public records. Future stations carry no opening date.

  3. 03

    Housing supply comes from the City of Toronto Development Pipeline analytical file (retrieved 2026-10-08): 2,391 projects, of which 2,314 geocoded, with status (proposed, active, built), proposed units, and application receipt date. The 800-metre join is haversine distance from the station point.

  4. 04

    Station zones overlap downtown (stations sit closer than 800 metres apart), so citywide totals are deduplicated: 365,770 homes (41.1%) sit within 800 metres of at least one open station. Per-station figures double-count shared projects and are correct only per station.

  5. 05

    date_received is the development application receipt date, not a completion date. Before/after comparisons measure application timing around station openings, which captures anticipation as well as response.

  6. 06

    What is missing: parcel-level sale prices over time are not open data in Ontario (Teranet is proprietary), so this dataset measures the supply response, not the price response. The 2-10% price uplift figure comes from 29 published studies, not from this file.

For developers

Query it from code, or from an agent.

Three consumption paths, same canonical data. REST for applications, OpenAPI for integration, MCP tools over streamable HTTP for AI agents.

Endpoints

GET

/api/v1/station/search?q=finch&status=all&limit=3

Search 125 stations by name, filter by open / under construction, ranked by pipeline homes

{
  "q": "finch", "total": 3,
  "hits": [
    { "id": "ttc-finch", "name": "Finch Station",
      "agency": "TTC", "status": "open",
      "units_800m": 10836, "projects_800m": 23 }
  ]}
Try it →

GET

/api/v1/station/lookup?station_id=ttc-finch-west

Full station record: location, opening date, 800m supply join, before/after opening split

{
  "id": "ttc-finch-west", "name": "Finch West Station",
  "opening_date": "2017-12-17",
  "supply": { "units_800m": 3593, "projects_800m": 4,
    "before_opening": { "projects": 0, "units": 0 },
    "after_opening": { "projects": 4, "units": 3593 } }}
Try it →

GET

/api/v1/supply/summary

Citywide aggregates: station counts, deduplicated 800m coverage, top stations, status split

{
  "stations_total": 125, "stations_open": 78,
  "units_within_800m_open_station_dedup": 365770,
  "units_within_800m_open_station_dedup_pct": 41.1,
  "top_stations_by_units": [ … ] }
Try it →

Connect your agent

Put this data to work inside your AI tools.

Pick your harness, copy the prompt, send it to your agent. Your agent runs the setup itself.

Copy and send this to Claude Code

Set up the Canada Transit Supply MCP server so I can query it from here.
1. Run: claude mcp add --transport http canada-transit-supply https://this-site.example/mcp
2. Run `claude mcp list` to confirm it connected.
3. Look up Finch West station and tell me how housing supply changed after it opened, and show me the result.

Data

Take the files.

The station inventory, the per-station supply join, and the aggregate summary, MIT licensed, as JSON.

stations.json

125 stations: location, agency, lines, opening date, status

Download
supply_by_station.json

Per-station 800m join: projects, homes, status split, before/after opening

Download
summary.json

Citywide aggregates and top-station rankings

Download